Multi-project Scheduling with Resource Transfers - Doreen Krüger - Boeken - BoD - 9783839125793 - 9 november 2009
Indien omslag en titel niet overeenkomen, is de titel correct

Multi-project Scheduling with Resource Transfers

Prijs
€ 62,99

Besteld in een afgelegen magazijn

Verwachte levering 18 aug. - 1 sep.
Ontvang meldingen over nieuwe releases van Doreen Krüger
Voeg toe aan uw iMusic-verlanglijst

Nog niet beoordeeld

Companies that carry out multiple projects in parallel often pursue a resource strategy that allows multi-tasking and multi-projecting. In such an environment resources have to switch between projects repeatedly. A large amount of time is spent on transferring or adjusting resources to new tasks on different projects. These transfer times - as well as the related cost - must be considered already in the planning phase of the (multi-)project to ensure efficient utilisation of scarce company resources. The book provides a deep insight into resource transfers and the resulting (multi-)project scheduling problem as well as various methods to generate transfer-regarding schedules.

Media Boeken     Paperback Book   (Boek met zachte kaft en gelijmde rug)
Vrijgegeven 9 november 2009
ISBN13 9783839125793
Uitgevers BoD
Pagina's 344
Afmetingen 150 × 220 × 10 mm   ·   412 g
Taal en grammatica Engels  

Meer door Doreen Krüger

Alles tonen

Meer van dezelfde uitgever